Product
Location:Home > Product > Others > Soft permeable pipe
Scan QR code
Diameter (mm): 50, 80, 100, 150, 200, 250, 300.
Length: According to customer requirements
Customization:
Various specifications can be processed and customized according to customer requirements
Packaging: White bag
Function:
The main function is to collect and drain water.
Product features:
Utilizing the "capillary" phenomenon and the "siphon" principle, integrating water absorption, permeability, and drainage, it has the pressure resistance, permeability, and filtration functions required by engineering design.
Usage:
Widely used in highway, railway subgrade, shoulder, soft soil foundation drainage; Drainage of tunnels and underpasses; Drainage of water conservancy dams; Drainage of the central isolation zone of the highway, outdoor sports venues, and roof garden drainage
Soft permeable pipe is a new type of pipe material with reverse filtration (drainage) function. Due to its unique design principle and excellent performance of the constituent materials, the product has strong drainage and seepage effects. It utilizes the "capillary" phenomenon and "siphon" principle, integrates water absorption, permeability, and drainage, and has pressure resistance, permeability, and reverse filtration function that meet engineering design requirements.
Small pore diameter, all-round permeability, and good permeability
Weaving a filter layer to ensure effective filtration and prevent sediment from entering the tube
Compressive and corrosion-resistant
High compressive and tensile strength, long service life; Good corrosion resistance and microbial resistance;
high stability
Under high temperature and pressure, it is not easily deformed, has good stability, and weather resistance.
Lightweight and convenient for construction
Soft texture and good adhesion to soil. Good overall continuity, few joints, and convenient connection;
Project | Performance Indicators Of Flexible Permeable Pipes | |||||||
Φ50 | Φ80 | Φ100 | Φ150 | Φ200 | Φ250 | Φ300 | ||
Wire Diameter (mm) ≥ | 1.6 | 2 | 2.6 | 3.5 | 4.5 | 5 | 5.5 | |
Steel wire spacing (circle/m) ≥ | 47 | 37 | 32 | 24 | 17 | 17 | 17 | |
Thickness (mm) ≥ | 0.3 | 0.34 | 0.36 | 0.38 | 0.42 | 0.6 | 0.6 | |
Filter Cloth | Longitudinal tensile strength (kN/5cm)≥ | 1 | ||||||
Longitudinal elongation (%)≥ | 15 | |||||||
Transverse tensile strength (kN/5cm)≥ | 0.8 | |||||||
Transverse elongation (%)≥ | 15 | |||||||
Ball bursting strength (kN)≥ | 1.4 | |||||||
Permeability coefficient (cm/s)≥ | 0.1 | |||||||
Equivalent Aperture (mm)≥ | 0.06-0.25 |
1. Vertical and horizontal drainage on the north side of various retaining walls;
7. Horizontal drilling drainage;
2. Drainage of highways, railway embankments, shoulders, and soft soil foundations;
8. Drainage and slope protection in areas prone to collapse and sliding;
3. Drainage of tunnels and underpasses;
9. Roof garden and flower bed drainage;
4. Drainage of power ash dams and water conservancy dams;
10. Water conservation on mountain slopes;
5. Drainage and protection of vegetation in the central isolation zone of highways;
11. Underground drainage for land preparation engineering;
6. Drainage of outdoor sports venues;
12. Low lying drainage and saline alkali land renovation system.
1. Prevent pipe inversion
The support body of the soft permeable pipe is a high-strength steel wire ring, which has high strength and can withstand a certain amount of soil covering pressure. But it is best to fix both ends first, and then fill with soil to avoid the soft permeable pipe from collapsing due to uneven horizontal thrust.
2. Preparation for laying
Firstly, the lower layer should be leveled and rolled, with a flatness of no more than 15mm and a compaction degree that meets the design requirements. Hard protrusions such as crushed stones and block stones are strictly prohibited on the surface.
3. Pipe connection
Direct connection: Remove the supporting steel wire ring from one end of the pipe, cut the outer covering material, insert it into another section of the pipe, and tie it tightly with a wire rope.
T-pipe connection: Remove the supporting steel wire ring from the end of the branch pipe, cut off the outer covering material, and then bundle it.
End treatment: Remove a section of the supporting steel wire ring from the end and tie it with nylon rope.
When paving, it should be straightened, smooth, and tightly attached to the lower bearing layer, without distortion, wrinkles, or overlap. The overlap should be fixed with U-shaped nails or connectors
Previous : Flexible Permeable Hose